ATCB lining up the ducks on YMEN DFO accident -
A rehash of where HVH's topcover bureau is currently at with the combined investigations surrounding the tragic Essendon DFO accident: AO-2017-024 & AI-2018-010
Quote:Updated: 9 February 2018
The investigation into this accident has been completed and a draft report is in the final stages of completion. The report will soon undergo a review by the ATSB’s Commission and by Directly Involved Parties (DIPs), which is a process that enables checking of factual accuracy and ensures natural justice. It has been necessary to extend the completion date for this investigation due to a number of factors, including accommodating the involvement of international DIPs, who have up to sixty days to comment under international conventions.
As with any ATSB investigation, if a critical safety issue is identified during the course of an investigation, it is immediately brought to the attention of the relevant parties so that appropriate safety action can be taken.
Last update 28 February 2018
Summary
On 21 February 2017, a building that is part of the Essendon Airport Bulla Road Precinct retail centre was struck by a Beechcraft King Air B200 (VH-ZCR). The ATSB’s preliminary report for this accident was published in March 2017. This preliminary report stated that the approval process for this building would be a matter for further investigation.
The building was part of the Bulla Road Precinct Retail Outlet Centre development, which was proposed by the lessee of Essendon Airport in 2003 and approved by the Federal Government in 2004.
Due to the specialist nature of the approval process and airspace issues attached to the retail centre development, and not to delay the final report into the accident from February 2017, the ATSB has decided to investigate this matter separately.
The investigation will examine the building approval process from an aviation safety perspective, including any airspace issues associated with the development, to determine the transport safety impact of the development on aviation operations at Essendon Airport.
A final report will be released at the conclusion of the investigation. Should a critical safety issue be identified during the course of the investigation, relevant parties will be immediately notified so that appropriate safety action can be taken.
General details
General details
Date: 21 February 2017
Investigation status: Active
Investigation phase: Evidence collection
Location (show map): Essendon Airport, Bulla Road Precinct Retail Outlet Centre
Investigation type: Safety Issue Investigation
State: Victoria
Report status: Pending
Expected completion: 3rd Quarter 2018
Last update 20 April 2018
And from the Airports thread:
Senate Report released -
Finally, in the Senate today the RRAT Legislative committee inquiry tabled their report into the Airports Amendment Bill 2016:
Report
Airports Amendment Bill 2016 [Provisions]
19 March 2018
© Commonwealth of Australia 2018
ISBN 978-1-76010-747-5
View the report as a single document - (PDF 315KB)
And from off the UP, Old Akro & Mr Peabody voice their frustrations:
Quote:OA: This accident has been over speculated. We need the ATSB to do its job and publish the report.
In Feb the ATSB put out a media release essentially saying that the report was done but release was delayed because of a requirement to give interested parties time to comment with the inference that this involving international parties was increasing this period to 60 days. This 60 day period has now elapsed by 30 days and still no report.
The exact same update was issued on the same day for the 3 September 2015 incident at Mt Hotham with VH-OWN & VH-LQR- an incident that occurred 32 months ago. .
The list of pending reports has grown to 109.
This is from the ATSB's current strategic plan:
" The Government’s recent Budget measures, and the ATSB’s organisational change program, position the ATSB to reduce its investigation backlog and increase its capacity to complete complex investigations within 12 months, which is a key deliverable of the ATSB."
The ATSB is clearly failing to do its job by any measure.
Mr Peabody: I think we will be waiting quite a while for this report to come out; according to the ATSB investigation status the report is still at "Final Report: Internal Review". That means it likely hasn't even gone to the DIPs yet, if it had the status should be "Final Report: External Review".
And yes they do appear to work at a cracking pace!! Snail wise I mean.
In a 'passing strange' coincidence I noted the following addition to the ATCB AAI webpage:
Quote:What happened
In October 2009, the operator of Essendon Airport (now Essendon Fields Airport) received an application from the Hume City Council (HCC) to construct a radio mast on top of the council office building at Broadmeadows, Victoria. The application was made under the Airports (Protection of Airspace) Regulations 1996 (APA Regulations) which was only applicable to leased, federally-owned airports, such as Essendon. The application identified that the building and existing masts had not been approved under the regulations. The regulations required any proposed construction that breached protected airspace around specific airports to be approved by the Secretary of the then Department of Infrastructure and Transport (Department). Protected airspace included airspace above a boundary defined by the Obstacle Limitation Surface (OLS). The Secretary was required to reject the application if the Civil Aviation Safety Authority (CASA) determined that the application would have an ‘unacceptable effect on safety’.
CASA’s initial response to the HCC application stated that the building and existing masts represented a hazard to aircraft and should be marked and lit, while the proposed radio mast represented a further hazard and, as such, would not be supported. The advice was considered inadequate by the Department, who instructed CASA that they required advice that either the application for the mast had an unacceptable effect on safety, or it did not. CASA subsequently determined that the application did not have an unacceptable effect on safety, and in addition, advised the Department of specific lighting and marking requirements to mitigate any risk presented by the mast. The Department approved the HCC application on 28 February 2011 conditional on appropriate marking and lighting being affixed to the radio mast and building. The ATSB has since been advised that the radio mast has been removed due to reasons unrelated to aviation safety.
What the ATSB found
The scope of this investigation was limited to the processes associated with protecting the airspace at leased, federally owned airports, and in particular the application of safety management principles as part of that process. The investigation used the HCC application for examining the APA Regulations processes, and as a result identified an issue specifically associated with that application. However, the investigation did not consider whether or not the aerial on the HCC building was unsafe.
The Airports Act 1996, which was administered by the Department, was the principal airspace safety protection mechanism associated with a leased, federally-owned airport’s OLS. The Australian Government had committed to using a safety management framework in the conduct of aviation safety oversight (that is, a systemic approach to ensuring safety risks to ongoing operations are mitigated or contained). In contrast, the conduct of safety oversight of an airport’s airspace under the Airports Act used a prescriptive approach (that is, the obstacle was either acceptable or unacceptable). This approach met the requirements of the Airports Act, but was not safety management-based. With respect to the assessment of the HCC application under the Airports Act, a safety management approach was not used.
What's been done as a result
The Department, now known as the Department of Infrastructure, Regional Development and Cities, has advised that it will confer with key stakeholders in the APA Regulations process regarding relevant risk management practices. The intent is to implement a more systematic approach to risk management, guided by the Commonwealth Risk Management Policy.
The Department has also identified the need to reform the current airspace protection regime based around the Airports Act. In a paper titled ‘Modernising Airspace Protection’, the Department identifies that current airspace protection regulation under the Civil Aviation Act 1988 and the Airports Act requires improvement, and has initiated public consultation regarding reforms into this particular regulatory system.
Safety message
A safety management system approach is considered ‘best practice’ by the International Civil Aviation Organization and has been adopted by Australia as the core method of aviation safety oversight through the State Aviation Safety Program. The Airports Act processes need to adopt safety management principles to the assessment of construction applications involving breaches of prescribed airspace, but rather, used a prescriptive regulatory approach. Construction proposals can impinge on aviation safety margins, such as those represented by the OLS. A fully informed, safety management-based approach should be used to ensure that safety is not compromised.
Background
Context
Safety analysis
Findings
Safety issues and actions
Sources and submissions
Appendices
This bit is IMO simply gob smacking in the observed subservience by CASA to what was then Murky's Department:
"..CASA’s initial response (sic)...while the proposed radio mast represented a further hazard and, as such, would not be supported. The advice was considered inadequate by the Department, who instructed CASA that they required advice that either the application for the mast had an unacceptable effect on safety, or it did not. CASA subsequently determined that the application did not have an unacceptable effect on safety, and in addition, advised the Department of specific lighting and marking requirements to mitigate any risk presented by the mast..."
Reference safety issue: AI-2013-102-SI-01
Quote:The use of risk management principles when considering an application under the Airports (Protected Airspace) Regulations
Issue number: AI-2013-102-SI-01
Who it affects: Airports managing protected airspace associated with their runways
Issue owner: The Department of Infrastructure, Regional Development and Cities
Operation affected: Aviation: Airspace management
Background: Investigation Report AI-2013-102
Date: 03 May 2018
Safety issue description
The Department of Infrastructure, Regional Development and Cities adopted a prescriptive approach to the Hume City Council building application within the obstacle limitation area of Essendon Airport, which was in accordance with the process prescribed under the Airports (Protection of Airspace) Regulations 1996, but did not require the application of risk management principles to the department’s consideration.
Proactive Action
Action organisation: Department of Infrastructure, Regional Development and Cities
Action number: AI-2013-102-NSA-063
Date: 03 May 2018
Action status: Monitor
In response to this safety issue, the Department of Infrastructure, Regional Development and Cities (Department) advised that:
The Department notes the ATSB comments that the approach to the application was in accordance with the relevant applicable regulations i.e. the Airports (Protection of Airspace) Regulations 1996 (APA Regulations). The Department also notes that under APA Regulations r. 14(2) the Secretary must approve applications unless they interfere with the safety, efficiency or regularity of air transport operations.
As outlined in the report, the Department stresses that the primary responsibility for providing safety advice rests with CASA, given that under APA Regulations r. 14(6) the Secretary must not approve a proposal for a controlled activity if CASA has advised the Secretary that carrying out the controlled activity would have an unacceptable effect on the safety of existing or future air transport.
While the Department does consider relevant risks (including to safety, efficiency and regularity) in considering applications under the APA Regulations, the Department agrees that in the future a more systematic approach to risk management should be implemented in relation to applications being assessed under these regulations. To this end, the Department will be guided by its internal 2015 Risk Management Framework, which aligns with the 2014 Commonwealth Risk Management Policy. The Department will document its risk management approach to airspace protection applications during 2018.
The Department will also work with key stakeholders to understand and document relevant risk management practices within those organisations (particularly CASA) that impact on the application processes and advice provided to the Department for the purposes of the regulations.
A significant change since the 2010 incident has been that in October 2015 the Victorian Government amended the Victoria Planning Provisions to include mandatory consideration of National Airports Safeguarding Framework Principles and Guidelines in planning processes around the state’s airports and airfields. This is outlined at: www.dtpli.vic.gov.au/planning/plans-and-policies/planning-for-airports/the-national-airports-safeguarding-framework.
This amendment will assist in early identification of potential airspace intrusions and facilitate communication between the relevant regulators, airports and developers. Further information about the National Airports Safeguarding Framework Principles and Guidelines is available at: www.infrastructure.gov.au/aviation/environmental/airport_safeguarding/nasf/index.aspx
The Department continues to work with industry and State, Territory and local governments to improve awareness of airspace protection issues and planning processes.
The Department is currently reviewing the airspace regulations as they will sunset in April 2019 under the Legislation Act 2003 and will also take into account the ATSB’s findings on this matter.
ATSB response:
The ATSB welcomes the above proposed safety action concerning introducing a risk based approach to decision making. The ATSB will monitor the progress of implementing this safety action in future amendments to airspace regulations.
Current issue status:
Safety action pending
[i]Last update 03 May 2018[/i]
The above safety issue response, from the current iteration of the Dept, would appear to suggest that finally we have a Dept Secretary that acknowledges the inherent deficiencies of the regulations surrounding airspace and airport protection in both the CA and Airport Acts.
However IMO it is still totally unacceptable that this investigation has been O&O'd at HVH HQ for the better part of half a decade, only to be dragged out now when other investigations may potentially draw attention to the ATCB's apparent inability to independently investigate and make safety recommendations to help industry participants proactively mitigate safety risk issues...
MTF...P2